Renovating Sellwood Bridge

Renovating Sellwood Bridge-Feb 2012 low res_001.jpg
Renovating Sellwood Bridge-Feb 2012 low res_001.jpg

Renovating Sellwood Bridge

500.00

11” x 14”  oil on linen panel. Construction on the new Sellwood Bridge in Portland began sometime in 2014 and is expected to be completed in 2017.  This painting began as a plein air piece and was finished in the studio.

Add To Cart